General Information
Completion: | 1994 |
---|---|
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Saint-Ursanne, Clos du Doubs, Jura, Switzerland |
---|---|
Coordinates: | 47° 21' 35.24" N 7° 8' 43.60" E |
Technical Information
Dimensions
total length | 88 m | |
number of spans | 2 | |
deck | deck depth | max. 2.40 m |
deck depth at abutments | 1.60 m |
Quantities
concrete volume | 900 m³ | |
reinforcing steel | 95 t |
Cost
cost of construction | Swiss Franc 1 880 000 |
Materials
deck |
prestressed concrete
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20006453 - Published on:
20/10/2002 - Last updated on:
02/01/2018