General Information
Completion: | 1993 |
---|---|
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with harp system |
---|---|
Function / usage: |
Road bridge |
Structure: |
Two-span cable-stayed bridge |
Material: |
Reinforced concrete bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Saint-Ursanne, Clos du Doubs, Jura, Switzerland |
---|---|
Coordinates: | 47° 21' 56.38" N 7° 9' 57.29" E |
Technical Information
Dimensions
main span | 56 m | |
number of cables | 20 | |
deck | deck slab thickness | 45.5 - 56 cm |
Cost
cost of construction | Swiss Franc 3 173 000 |
Materials
pylon |
reinforced concrete
|
---|---|
deck |
reinforced concrete
|
stay cables |
steel wire
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20006272 - Published on:
16/10/2002 - Last updated on:
02/01/2018