General Information
Completion: | 2 September 1972 |
---|---|
Status: | in use |
Project Type
Support conditions: |
for registered users |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Multiple T-section girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
original configuration: Single-span girder bridge current configuration: Three-span continuous girder bridge |
Location
Location: |
Arconciel, Fribourg, Switzerland Corpataux-Magnedens, Fribourg, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 46° 45' 8.12" N 7° 6' 20.54" E |
Technical Information
Dimensions
total length | 98.34 m | |
total width | 9.50 m | |
roadway / carriageway width | 6.00 m |
Design Loads
Reconfiguration | ||
---|---|---|
design code(s) |
SIA 269:2011 SIA 262:2003 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
precast prestressed concrete
|
Case Studies and Applied Products
TENSA®CRETE RE & RE-LS – Single gap joints
The RE Expansion Joint is a 100% watertight joint construction with two heavy steel edge profiles, which are locked in a special polymer concrete (Robo®Flex) beam that is placed on both sides of the joint.
[more]Participants
Reconfiguration (-2015)
Owner
Structural engineering
Consulting engineers
Contractor
Bearings
Expansion joints
Relevant Web Sites
Relevant Publications
- Assainissement du pont de la Tuffière. In: Tracés, v. 142, n. 7 (1 April 2016), pp. 6-12. (2016):
- About this
data sheet - Structure-ID
20071213 - Published on:
18/05/2016 - Last updated on:
18/05/2016