General Information
Completion: | 2003 |
---|---|
Status: | in use |
Project Type
Structure: |
Half-through arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Chooz, Ardennes (08), Grand-Est, France |
---|---|
Crosses: |
|
Coordinates: | 50° 6' 8.38" N 4° 48' 36.38" E |
Technical Information
Dimensions
main span | 52 m | |
total length | 112 m | |
span lengths | 28 m - 52 m - 30 m | |
number of spans | 3 | |
deck | width | 7.76 m |
deck slab thickness | ø 200 mm |
Quantities
arch | structural steel | S355: 135 t S460: 10 t |
deck | structural steel | S355: 105 t S460: 40 t |
concrete volume | 200 m³ | |
reinforcing steel | 50 t | |
suspenders | prestressing steel | 1.1 t |
Cost
construction cost (without tax) | Euro 3 660 000 |
Materials
deck |
reinforced concrete
|
---|---|
piers |
reinforced concrete
|
arch |
steel
|
abutments |
reinforced concrete
|
Chronology
2000 | Invitation to tender. |
---|---|
2000 | The contract is signed. |
Participants
Owner
Client
Design
- Marc Mimram Ingénierie
- Marc Mimram (designer)
Technical advisor to the owner
Construction engineers
- Bureau d'études Greisch (deck)
- SBE (substructure)
Checking engineering
Civil works
Steel construction
Earthworks
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridges - Ponts - Brücken. Atrium, Mexico City (Mexico), pp. 550-555. (2002):
- Le nouveau pont sur la Meuse à Chooz. In: Bulletin ouvrages métalliques, n. 3 ( 2004), pp. 8-25. (2004):
- Nouveau pont sur la Meuse à Chooz. Etudes d'exécution. In: Construction Métallique, n. 2 ( 2005), pp. 37-50. (2005):
- Un ouvrage d'art léger tendu sur la Meuse. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5190 (16 May 2003), pp. 45. (2003):
- About this
data sheet - Structure-ID
20010569 - Published on:
01/11/2003 - Last updated on:
05/02/2016