General Information
Completion: | 1971 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Besançon, Doubs (25), Bourgogne-Franche-Comté, France Beure, Doubs (25), Bourgogne-Franche-Comté, France |
---|---|
Crosses: |
|
Coordinates: | 47° 12' 40.64" N 5° 59' 50.90" E |
Technical Information
Dimensions
span lengths | 38 m - 54 m - 38 m | |
number of spans | 3 | |
deck | deck depth | 2.24 m |
deck width | 9.85 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Client
Contractor
Rehabilitation
Consulting engineers
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Renforcement d'ouvrages en béton précontraint. Réparation du pont de Beure sur le Doubs. In: Ouvrages d'art, n. 18 (July 1994), pp. 16-19. (1994):
- About this
data sheet - Structure-ID
20010648 - Published on:
10/11/2003 - Last updated on:
05/02/2016