General Information
Completion: | 1997 |
---|---|
Status: | in use |
Project Type
Structure: |
Two-span single-pylon cable-stayed bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
cable geometry: Cable-stayed bridge with fan system |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nemours, Seine-et-Marne (77), Ile-de-France, France |
---|---|
Crosses: |
|
Coordinates: | 48° 16' 44" N 2° 41' 35" E |
Technical Information
Dimensions
main span | 73.75 m | |
total length | 166 m | |
number of spans | 5 |
Materials
superstructure |
prestressed concrete
|
---|
Participants
Owner
Client
Design
- Jean Muller International
- Jean Muller (designer)
Architecture
- Evrard Marchal (architect)
Structural engineering
- Michel Duviard (structural engineer)
Construction
Stay cables
Prestressing
(role unknown)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les plus beaux ponts de France. Bonneton, Paris (France), pp. 186. (2001):
- Pont sur le Loing à Nemours. Bridge over the Loing at Nemours. Presented at: La Technique française du béton, XIIIe congrès de la FIB, Amsterdam 1998, pp. 459-471. (1998):
- About this
data sheet - Structure-ID
20002522 - Published on:
15/12/2001 - Last updated on:
05/02/2016