General Information
Completion: | 1965 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Haunched girder bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Location
Location: |
Besançon, Doubs (25), Bourgogne-Franche-Comté, France |
---|---|
Crosses: |
|
Coordinates: | 47° 13' 51.57" N 6° 1' 2.35" E |
Technical Information
Dimensions
span lengths | 29 m - 54 m - 29 m | |
number of spans | 3 | |
deck | deck depth | 1.115 - 2.60 m |
total width | 21 m | |
roadway / carriageway width | 16 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Travaux de mise en sécurité du pont Charles de Gaulle à Besançon. In: Ouvrages d'art, n. 61 (July 2009), pp. 2-12. (2009):
- About this
data sheet - Structure-ID
20039086 - Published on:
16/08/2008 - Last updated on:
04/06/2017