0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2012
Completion: 1 March 2013
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Duero
Coordinates: 41° 29' 43.38" N    5° 45' 29.37" W
Show coordinates on a map

Technical Information

Dimensions

total length 424.50 m
span lengths 40 m - 70 m - 3 x 92 m - 38.5 m
number of spans 6

Cost

cost of construction Euro 16 000 000

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20076890
  • Published on:
    24/02/2019
  • Last updated on:
    26/02/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine