General Information
Name in local language: | Pleißetalbrücke |
---|---|
Official designation: | BW 122 |
Beginning of works: | September 1995 |
Completion: | December 1997 |
Duration of works: | 27 months |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Crimmitschau, Zwickau (Kreis), Saxony, Germany |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 50° 50' 3.65" N 12° 23' 38.68" E |
Technical Information
Dimensions
main span | 45.50 m | |
width | 36 m | |
total length | 550 m | |
span lengths | 35 m - 9 x 45.5 m - 2 x 37 m - 31 m | |
number of spans | 13 | |
bridge surface | 19 800 m² | |
height above valley floor or water | 23 m | |
deck | deck depth | 3 m |
Quantities
concrete volume | 15 400 m³ |
Cost
cost of construction | German Mark 38 000 000 | |
cost of construction per m² | German Mark 1847 |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Client
Original design
Architecture
- Frank Berwinkel (architect)
Structural engineering
Checking engineering
- Tilman Zichner (checking engineer)
Co-contractor
Pot bearings
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 65-70.
- About this
data sheet - Structure-ID
20009924 - Published on:
08/08/2003 - Last updated on:
15/04/2016