General Information
Name in local language: | Talbrücke Pleichach |
---|---|
Official designation: | BW 657a |
Beginning of works: | Spring 2017 |
Completion: | Fall 2021 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Structure: |
Single-cell box girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Rimpar, Würzburg (Kreis), Bavaria, Germany |
---|---|
Carries: |
A 7 Motorway (Germany)
|
Coordinates: | 49° 51' 31.96" N 9° 59' 42.34" E |
Technical Information
Dimensions
width | 36.23 m | |
total length | 350.00 m | |
span lengths | 34.00 m - 6 x 47.00 m - 34.00 m | |
number of spans | 8 | |
bridge surface | 12 682 m² | |
height above valley floor or water | 26 m | |
deck | deck depth | 3.40 m |
piles | diameter | 1.50 m |
Quantities
concrete volume | 21 000 m³ | |
prestressing steel | 590 t | |
reinforcing steel | 4 190 t | |
piles | total length of piles | 3 000 m |
Cost
cost of construction | ca. Euro 32 500 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Design
Structural engineering
Contractor
Relevant Web Sites
Relevant Publications
- Chronik des Brückenbaus. Presented at: 31. Dresdner Brückenbausymposium, 7./8. Juni 2022, Dresden (Germany), pp. 208. (2022):