General Information
Project Type
Function / usage: |
Apartment building |
---|
Location
Location: |
Grand Rapids, Kent County, Michigan, USA |
---|---|
Address: | 201 West Fulton Street |
Coordinates: | 42° 57' 50.44" N 85° 40' 24.90" W |
Technical Information
Dimensions
height | 105.16 m | |
number of floors (above ground) | 34 |
Excerpt from Wikipedia
Plaza Towers is a mixed-use highrise building in Grand Rapids, Michigan. At 345 feet (105 m), it was the tallest building in the city until the completion of the River House Condominiums in 2008. The building contains apartments on floors 8–14, individually owned condominiums on floors 15–32, and a 214-room Courtyard by Marriott hotel on floors 1–7.
Building history
Construction and early issues
Construction began in 1988 with $60 million financing to Havlik by Amway and a Japanese bank. The building opened in 1991 as Eastbank Waterfront Towers during a mini-boom in downtown development. However, it experienced significant structural, water leakage, and HVAC problems and had to be closed and completely re-skinned in 1995–97, just five years after opening. Vertical cracks in exterior cement panels were the cause of the water leakage, which soaked and molded interior carpets. Corroded pipes caused issues with the cooling system and air ducts distributed foul smells. The $36 million 1995 renovation was financed by Amway, who gained majority ownership. 250 residents and 160 building employees were displaced for two years during renovation work. Prior to reopening, the Radisson hotel chain left the project and the name of the building was changed to Plaza Towers. Eenhoorn LLC bought the building from Amway for $17.5 million in 2001. Amway's $31.5 million loss in the project was a “philanthropic gesture” for downtown development. Many legal battles took place over faulty construction, excessive initial project cost, and renovation displacements.
Evacuations for fire
Small fires in the building have led to evacuations in 1996, 2001, 2002, and 2010. The 2010 evacuation was due to a 17th-floor fire causing fire and water damage, but no injuries.
Evacuations for flood
The building was again evacuated on April 20, 2013, as the flooded Grand River filled the lower level mechanical space and flooded the basement parking garage with over 7 feet of water. A waterlogged basement generator sent black smoke through the entire building and approximately 80 vehicles parked in the basement garage were flooded with up to 11 feet of water. Structural concerns for a sanitary sewer line under the building (dating back to a time when Campau Ave. extended to Fulton, where the building now stands) caused building maintenance to keep the lowest level of the building flooded until the river receded to prevent erosion under the building and around the sewer line, which prolonged the evacuation. The evacuation lasted until the building reopened on May 8, 2013.
Text imported from Wikipedia article "Plaza Towers" and modified on November 15, 2021 according to the CC-BY-SA 4.0 International license.