General Information
Completion: | 2002 |
---|---|
Status: | in use |
Project Type
Construction method: |
Balanced cantilever method |
---|---|
Structure: |
Girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Villavicencio, Meta, Colombia |
---|---|
Connects to: |
Pipiral Tunnel (2002)
|
Coordinates: | 4° 9' 45.04" N 73° 42' 22.56" W |
Technical Information
Dimensions
main span | 125 m | |
total length | 545 m | |
height above valley floor or water | 122 m | |
deck | width | 12.90 m |
girder depth | 2.8 - 7.40 m | |
piers | height | 15 - 82 m |
deck depth at abutments | 6 |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
- About this
data sheet - Structure-ID
20052801 - Published on:
08/02/2010 - Last updated on:
05/02/2016