0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2002
Status: in use

Project Type

Construction method: Balanced cantilever method
Structure: Girder bridge
Material: Prestressed concrete bridge

Location

Location: , ,
Connects to: Pipiral Tunnel (2002)
Coordinates: 4° 9' 45.04" N    73° 42' 22.56" W
Show coordinates on a map

Technical Information

Dimensions

main span 125 m
total length 545 m
height above valley floor or water 122 m
deck width 12.90 m
girder depth 2.8 - 7.40 m
piers height 15 - 82 m
deck depth at abutments 6

Materials

deck prestressed concrete

Participants

Checking engineering
Contractor

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20052801
  • Published on:
    08/02/2010
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine