General Information
Completion: | 2001 |
---|---|
Status: | in use |
Project Type
Structure: |
T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Location
Location: |
Dammam, Saudi Arabia |
---|
Technical Information
Dimensions
total length | 625 m | |
standard span lengths | 28 m / 32.5 m / 37.5 m | |
deck | deck width | 2 x 20.5 m |
Materials
girders |
precast prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridge to the King Fahd International Airport Dammam post-tensioned using the DYWIDAG Multistrand System. In: DSI Info, n. 11 ( 2002- 2003), pp. 30.
- Brücke zum König Fahd Flughafen Dammam mit DYWIDAG-Spannverfahren vorgespannt. Bau der "Pipeline Corridor Bridge" in Saudi-Arabien. In: DSI Info, n. 11 ( 2002- 2003), pp. 30.
- Pont à l'aéroport King Fahd à Dammam avec précontrainte DYWIDAG. Le «Pipeline Corridor Bridge» en Arabie Saoudite. In: DSI Info, n. 11 ( 2002- 2003), pp. 30.
- About this
data sheet - Structure-ID
20011727 - Published on:
07/04/2004 - Last updated on:
05/02/2016