0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1941
Status: in use

Project Type

Structure: Earthfill dam
Function / usage: Hydroelectric dam / plant

Location

Location: , , ,
Impounds:
  • Cooper River
Coordinates: 33° 14' 40.19" N    79° 59' 28.71" W
Show coordinates on a map

Technical Information

Dimensions

height 42.7 m
length 3 538 m

Excerpt from Wikipedia

Pinopolis Dam is a dam in Berkeley County, South Carolina.

The earthen and concrete dam was completed in 1941 by Santee Cooper, the state-owned electric and water utility also known as South Carolina Public Service Authority. The dam is 138 feet high and 11,500 feet long at its crest.

Broadly speaking, the dam impounds the Cooper River and creates Lake Moultrie. Specifically Lake Moultrie is fed directly from Lake Marion by a diversion canal built concurrently with the dam. This artificial rerouting of the Cooper River basin has effectively unified the Santee and Cooper River systems into a single hydrological drainage entity.

The overall New Deal-era Santee Cooper Power and Navigation Project improved navigation, provided hydroelectric power, and improved the general health, recreation, and economy of the area. The project was the largest land-clearing project in U.S. history up to that point, with over 12,500 workers clearing over 177,000 acres (720 km²) of swamp and forestland. 42 miles (68 km) of dams and dikes were constructed, including a 26-mile (42 km), 78-foot (24 m) tall earthen dike. The Pinopolis Dam included the hydroelectric station and navigation lock, the highest single-lift lock in the world. A 3,400-foot (1,000 m) spillway was built to control floodwaters, with 62 gates allowing overflow of excess water. In completing the largest earth-moving project in the nation's history, 42,000,000 cubic yards (32,000,000 m³) of earth were moved and 3.1 million cubic yards of concrete were poured.

The $48.2 million project (55 percent federal loan, 45 percent federal grant) first generated electricity on Feb. 17, 1942. As transmission lines were built, power flowed to customers in Berkeley, Georgetown and Horry counties, and ultimately to electric cooperatives serving customers in 46 counties.

The Pinopolis generating station was renamed Jefferies Hydroelectric Station in 1996 after Richard Manning Jefferies, former Governor of South Carolina and executive of Santee Cooper. It produced 243 MWh electricity in 2019.

The project also flooded the Santee Canal, the cemeteries and plantations of St John's Parish Berkeley, and other historic resources.

Text imported from Wikipedia article "Pinopolis Dam" and modified on November 4, 2021 according to the CC-BY-SA 4.0 International license.

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003578
  • Published on:
    12/06/2002
  • Last updated on:
    30/10/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine