Beginning of works: 1953
Completion: 1958
Status: in use

Project Type

Function / usage: Hydroelectric dam / plant
Structure: Arch dam
Material: Concrete dam

Location

Location: ,
, ,
Impounds:
  • Douro River
Coordinates: 41° 22' 42.09" N    6° 21' 5.66" W
Show coordinates on a map

Technical Information

Dimensions

height 100 m
retained water volume 63 000 000 m³
crest length 139 m
crest thickness 3.45 m
spillway capacity 11 000 m³/s
dam volume 205 000 m³

Materials

dam structure concrete

Excerpt from Wikipedia

Picote Dam (Portuguese:Barragem de Picote) is a concrete arch dam on the Douro, located in the municipality Miranda do Douro, in Bragança District, Portugal.

Construction of the dam began in 1953. The dam was completed in 1958. It is owned by Companhia Portuguesa de Produção de Electricidade (CPPE). Picote Dam was the first dam constructed by Portugal on the Douro.

Dam

Picote Dam is a 100 m tall (height above foundation) and 139 m long arch dam with a crest altitude of 480 m. The volume of the dam is 205,000 m³. The spillway is located on its crest and is controlled by four tainter gates. It has a maximum discharge of 11,000 m³/s (390,000 cu ft/s) while one bottom outlet can discharge up to 600 m³/s (21,000 cu ft/s).

Reservoir

At full reservoir level of 471 m (maximum flood level of 478 m) the reservoir of the dam (Portuguese:Albufeira da Barragem de Picote) has a surface area of 2.44 km² and its total capacity is 63 mio. m³ (active capacity 13.43 mio. m³).

Power plant Picote I

The power plant Picote I is a run-of-the-river hydroelectric power station with a nameplate capacity of 195 MW. Its average annual generation is 868,6 (838, 941, or 1,038) GWh. The power station contains three 65 MW Francis turbine-generators in an underground powerhouse.

The minimum hydraulic head is 63 m, the maximum 74 m. Maximum flow per turbine is 117 m³/s.

The plant is owned by CPPE, but operated by EDP.

Power plant Picote II

In March 2007 construction began on the Picote II hydroelectric power plant. In December 2011 work on an additional underground powerhouse was completed and a further turbine with 246 MW went online. Its average annual generation is 244 GWh.

The plant is owned by CPPE, but operated by EDP.

Text imported from Wikipedia article "Picote Dam" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.

Participants

Owner
Structural engineering
Co-contractor

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20012728
  • Published on:
    03/08/2004
  • Last updated on:
    14/02/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine