0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2 November 1976
Completion: October 1985
Status: in use

Project Type

Function / usage: High-speed rail tunnel
Structure: Tunnel
Construction method: Cut-and-cover method

Location

Location: , ,
Part of:
Coordinates: 49° 26' 58.81" N    8° 31' 49.55" E
Coordinates: 49° 24' 18.34" N    8° 32' 50.35" E
Show coordinates on a map

Technical Information

Dimensions

total length 5 380 m

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20012525
  • Published on:
    25/07/2004
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine