General Information
Completion: | 2002 |
---|---|
Status: | in use |
Project Type
Structure: |
Two-span single-pylon cable-stayed bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Brunswick, Lower Saxony, Germany |
---|---|
Crosses: |
|
Next to: |
Petritorbrücke (2003)
|
Coordinates: | 52° 16' 4.89" N 10° 30' 43.69" E |
Coordinates: | 52° 16' 5.27" N 10° 30' 45.19" E |
Technical Information
Dimensions
deck | deck width | 3.42 m |
Materials
pylons |
steel
|
---|---|
deck slab |
reinforced concrete
|
girders |
steel
|
Notes
Two virtually identical footbridges flanking a road bridge.
Participants
Architecture
- Schulitz Architekten
- Helmut C. Schulitz (architect)
Structural engineering
Construction
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20005278 - Published on:
22/09/2002 - Last updated on:
05/02/2016