General Information
Completion: | 20 July 2015 |
---|---|
Status: | in use |
Project Type
Material: |
Fiber-reinforced concrete bridge |
---|---|
Structure: |
U-shaped girder bridge |
Function / usage: |
Bicycle and pedestrian bridge |
Location
Location: |
Lausanne, Vaud, Switzerland |
---|---|
Coordinates: | 46° 31' 31.79" N 6° 36' 21.18" E |
Technical Information
Dimensions
total length | 15.708 m | |
span | 15.3 m | |
deck slab thickness | 0.05 m | |
girder depth | 0.920 m / 1.343 m | |
web thickness | 0.04 m / 0.05 m | |
walkway width | 2.50 m |
Materials
deck |
prestressed BCV® high-strength fiber-reinforced concrete
|
---|
Participants
Owner
Structural engineering
Consulting
-
Laboratoire de Maintenance, Construction et Sécurité des ouvrages de l'EPFL
- Eugen Brühwiler (consultant)
Contractor
Prefabrication
Prestressing
Cement supplier
Load testing
Relevant Web Sites
Relevant Publications
- Eine materialtechnologische Premiere. In: TEC21, v. 141, n. 51-52 (18 December 2015), pp. 14-16. (2015):
- Passerelle du Martinet en BFUP armé. Presented at: 2ème Journée d'étude Béton fibré ultra-performant - Concevoir, dimensionner, construire, Haute école d'ingénierie et d'architecture. Fribourg, Switzerland, October 22, 2015, pp. 75-78. (2015):
- About this
data sheet - Structure-ID
20071784 - Published on:
12/10/2016 - Last updated on:
09/06/2017