General Information
Completion: | 1978 |
---|---|
Status: | demolished (2008) |
Project Type
Structure: |
Two-hinged arch bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Prestressed concrete bridge |
Location
Location: |
Madrid, Madrid, Spain |
---|---|
Replaced by: |
Pasarela San Juan Bautista (2008)
|
Identical to: |
Pasarela Ángel Gordillo (1978)
|
Coordinates: | 40° 26' 56" N 3° 39' 44" W |
Technical Information
Dimensions
arch span | 103 m |
Materials
arch |
prestressed concrete
|
---|
Participants
Initial construction (1978)
Owner
Design
Demolition (2008)
Owner
Contractor
Demolition engineering
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Actuaciones de adecuación sobre las pasarelas arco de la M-30. Presented at: V Congreso de ACHE . :
- Dos pasarelas sobre la Avenida de la Paz. In: Hormigón y acero, v. 30, n. 130-132 (1st Quarter 1979), pp. 516-522. (1979):
- Fußgängerbrücken. Konstruktion, Gestalt, Geschichte. Birkhäuser, Basel (Switzerland), ISBN 978-3-7643-8138-7, pp. 68-69. (2007):
- About this
data sheet - Structure-ID
20007935 - Published on:
30/01/2003 - Last updated on:
06/03/2022