General Information
Name in local language: | Puente Papagayo |
---|---|
Completion: | 1991 |
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 141.0 m | |
total length | 315.0 m | |
span lengths | 75.9 m - 141.0 m - 96.9 m | |
number of spans | 3 | |
height above valley floor or water | 120 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
(role unknown)
Relevant Web Sites
Relevant Publications
- Tierra sobre el agua. Visión histórica universal de los puentes. Colegio de Ingenieros de Caminos, Canales y Puertos, Madrid (Spain), pp. 468. (1999):
- About this
data sheet - Structure-ID
20002294 - Published on:
11/11/2001 - Last updated on:
05/02/2016