General Information
Project Type
Construction method: |
Balanced cantilever method |
---|---|
Function / usage: |
Road bridge |
Structure: |
Box girder bridge Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Weil am Rhein, Lörrach (Kreis), Baden-Württemberg, Germany Huningue, Haut-Rhin (68), Grand-Est, France |
---|---|
Crosses: |
|
Coordinates: | 47° 36' 3.43" N 7° 35' 34.49" E |
Technical Information
Dimensions
width | 10.50 m | |
total length | 288.66 m | |
span lengths | 64.71 m - 105 m - 73.20 m - 45.75 m | |
number of spans | 4 |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Engineering
- E. Schmidt (engineer)
Checking engineering
- H. Wippel (checking engineer)
Construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les grands ponts du monde: Ponts remarquables d'Europe. Brissaud, Poitiers (France), pp. 54. (1990):
- Ingenieurbauführer Baden-Württemberg. 1st edition, Bauwerk Verlag, Berlin (Germany), pp. 222-223. (1999):
- Neue, frei vorgebaute Spannbetonbrücken über den Rhein in Köln-Deutz, Konstanz und Weil. In: Beton- und Stahlbetonbau, v. 75, n. 7 (July 1980), pp. 153-160, 197-200. (1980):
- About this
data sheet - Structure-ID
20001598 - Published on:
04/08/2001 - Last updated on:
05/02/2016