General Information
Completion: | 1997 |
---|---|
Status: | demolished (2002) |
Project Type
Structure: |
Pontoon bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Koror, Palau |
---|---|
Replaces: |
Koror-Babeldaob Bridge (1978)
|
Replaced by: |
Koror-Babeldaob Bridge (2002)
|
Technical Information
Materials
deck |
steel
|
---|---|
piers |
steel
|
Participants
Construction
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20006029 - Published on:
06/10/2002 - Last updated on:
05/02/2016