General Information
Project Type
Function / usage: |
Logistics center |
---|---|
Structure: |
Two-hinged arch |
Material: |
Reinforced concrete structure |
Location
Location: |
Munich, Bavaria, Germany |
---|---|
Address: | Arnulfstraße 195 |
Coordinates: | 48° 8' 49" N 11° 31' 24" E |
Technical Information
Dimensions
height | 31 m | |
span | 146.8 m | |
length | 124 m |
Materials
roof |
precast reinforced concrete
|
---|
Participants
Architecture
- Herbert Zettel (architect)
- Rudolf Rosenfeld (architect)
Structural engineering
-
Dyckerhoff & Widmann AG
- Helmut Bomhard (structural engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Architekturführer München. Architectural Guide to Munich. 2nd edition, Dietrich Riemer Verlag, Berlin (Germany), pp. 121 [# 217]. (2002):
- Concrete Shell Construction - Structures and Designs in the Federal Republic of Germany. Presented at: Theory and Experimental Investigation of Spatial Structures - Application of Shells in Engineering Structures, 23-29.09.1985, Moscow, pp. 103-126. (1985):
- Konstruktion und Bau der Paketumschlaghalle in München. Presented at: Betontag, 1969, Deutscher Betonverein, pp. 121-140. (1969):
- About this
data sheet - Structure-ID
20035078 - Published on:
06/03/2008 - Last updated on:
26/10/2021