General Information
| Other name(s): | Überführung der L 55 bei Schwarzheide |
|---|---|
| Completion: | 1995 |
| Status: | in use |
Project Type
| Structure: |
Girder bridge |
|---|---|
| Function / usage: |
Road bridge |
| Material: |
Composite bridge |
Location
| Location: |
Schwarzheide, Oberspreewald-Lausitz, Brandenburg, Germany |
|---|---|
| Coordinates: | 51° 29' 24.58" N 13° 53' 25.47" E |
Technical Information
Dimensions
| total length | 62.23 m | |
| span lengths | 2 x 31.144 m | |
| number of spans | 2 | |
| bridge surface | 793.41 m² | |
| deck | deck width | 12.75 m |
Cost
| cost of construction | German Mark 2 980 000 |
Materials
| deck |
composite
|
|---|
Participants
Owner
Client
Original design
Structural engineering
Checking engineering
- Jochen Haensel (checking engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 1997. Verkehrsblatt-Verlag, Dortmund (Germany), 1997, pp. 49-58.
- About this
data sheet - Structure-ID
20000762 - Published on:
07/06/2000 - Last updated on:
05/02/2016


