General Information
Other name(s): | Überführung der L 55 bei Schwarzheide |
---|---|
Completion: | 1995 |
Status: | in use |
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Composite bridge |
Location
Location: |
Schwarzheide, Oberspreewald-Lausitz, Brandenburg, Germany |
---|---|
Coordinates: | 51° 29' 24.58" N 13° 53' 25.47" E |
Technical Information
Dimensions
total length | 62.23 m | |
span lengths | 2 x 31.144 m | |
number of spans | 2 | |
bridge surface | 793.41 m² | |
deck | deck width | 12.75 m |
Cost
cost of construction | German Mark 2 980 000 |
Materials
deck |
composite
|
---|
Participants
Owner
Client
Original design
Structural engineering
Checking engineering
- Jochen Haensel (checking engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 1997. Verkehrsblatt-Verlag, Dortmund (Germany), 1997, pp. 49-58.
- About this
data sheet - Structure-ID
20000762 - Published on:
07/06/2000 - Last updated on:
05/02/2016