General Information
Completion: | 1966 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
main bridge: Bascule bridge |
Material: |
main bridge: Steel bridge Structurae Plus/Pro - Subscribe Now! |
Structure: |
approach viaducts: Girder bridge |
Material: |
approach viaducts: Prestressed concrete bridge |
Location
Location: |
Leiden, South Holland, Netherlands |
---|---|
Coordinates: | 52° 9' 41.83" N 4° 26' 54.35" E |
Technical Information
Dimensions
main span | 27 m | |
total length | 230 m | |
number of lanes | 2 x 2 |
Materials
piers |
reinforced concrete
|
---|---|
deck of approach viaducts |
precast prestressed concrete
|
Case Studies and Applied Products
Strengthening of the A44 approach bridges near Leiden, The Netherlands
The bridge accommodating the A44 Motorway near the city of Leiden northeast of The Hague is more than 50 years old. Here, two parallel steel bascule bridges with reinforced concrete approach bridges cross th ... [more]
Participants
Strengthening
Prestressing
Relevant Web Sites
- About this
data sheet - Structure-ID
20074455 - Published on:
02/01/2018 - Last updated on:
02/01/2018