0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2014
Completion: 2015
Duration of works: 14 months
Status: in use

Project Type

Structure: Through arch bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge

Location

Location: , , ,
Coordinates: 50° 55' 52.80" N    12° 57' 18.19" E
Show coordinates on a map

Technical Information

Dimensions

total length 90.95 m
span 74.94 m
deck width 12.35 m
on-center distance between girders 9.870 m
arches width 0.800 m
rise 10 m

Design Loads

design speed 140 km/h

Materials

deck steel
arches steel
springings reinforced concrete
abutment reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20072977
  • Published on:
    11/05/2017
  • Last updated on:
    01/06/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine