0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1948
Completion: 1953
Status: in use

Project Type

Structure: Through truss bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge

Location

Location: ,
Crosses:
  • Sava River
Coordinates: 44° 44' 21.08" N    20° 18' 55.45" E
Show coordinates on a map

Technical Information

Dimensions

total length 658.34 m
main spans 4 x 92.50 m

Quantities

structural steel 2 200 t

Materials

truss steel

Chronology

1968

Bridge is recalculated, strengthened and the put into service with a single track after not being used for 10 years.

1984

Calculations are made to add a second track.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003754
  • Published on:
    20/06/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine