General Information
Project Type
Structure: |
Through truss bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Material: |
Steel bridge |
Location
Technical Information
Dimensions
total length | 658.34 m | |
main spans | 4 x 92.50 m |
Quantities
structural steel | 2 200 t |
Materials
truss |
steel
|
---|
Chronology
1968 | Bridge is recalculated, strengthened and the put into service with a single track after not being used for 10 years. |
---|---|
1984 | Calculations are made to add a second track. |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Belgrade Bridges across the Danube and Sava River. Presented at: 3. Internationale Donaubrückenkonferenz, 3rd International Conference on Bridges across the Danube, 29-30/10/1998, Regensburg, Germany, pp. 358-372. (1998):
- About this
data sheet - Structure-ID
20003754 - Published on:
20/06/2002 - Last updated on:
05/02/2016