General Information
Status: | in use |
---|
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
main span | 198 m | |
total length | 260 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Design
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20008163 - Published on:
12/02/2003 - Last updated on:
05/02/2016