General Information
Status: | in use |
---|
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
U-shaped girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Construction method: |
Longitudinal launching |
Location
Location: |
Lucy-le-Bocage, Aisne (02), Hauts-de-France, France |
---|---|
Crosses: |
|
Part of: |
|
Coordinates: | 49° 2' 40.41" N 3° 15' 31.02" E |
Technical Information
Dimensions
main span | 42.57 m | |
length | 165 m | |
number of spans | 5 | |
crossing angle | 26 gon | |
girders | length | 160 m |
Quantities
structural steel | 1 100 t |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
girders |
steel
|
Participants
Owner
Client
Main contractor
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le lot 13: de la vallée de l'Ourcq à Château-Thierry. In: Travaux, n. 811 (September 2004), pp. 46-55. (2004):
- Viaduc de franchissement de l'autoroute A4 à Marigny-en-Orxois (Aisne). In: Bulletin ponts métalliques, n. 24 ( 2007), pp. 88-95. (2007):
- About this
data sheet - Structure-ID
20014591 - Published on:
25/11/2004 - Last updated on:
20/04/2019