0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1953
Completion: 1954
Status: in use

Project Type

Function / usage: Road bridge
Material: Prestressed concrete bridge
Structure: Girder bridge

Location

Location: , , ,
Crosses:
  • Doubs
Coordinates: 47° 8' 42.87" N    5° 39' 21.70" E
Show coordinates on a map

Technical Information

Dimensions

width 8 m
span lengths 5 x 28 m
number of spans 5

Materials

deck prestressed concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20074261
  • Published on:
    27/11/2017
  • Last updated on:
    28/11/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine