General Information
Completion: | 1956 |
---|---|
Duration of works: | 5 months |
Status: | in use |
Project Type
Material: |
Prestressed concrete bridge |
---|---|
Structure: |
Rigid frame bridge with inclined legs |
Function / usage: |
original use: Road bridge current use: Bicycle and pedestrian bridge |
Location
Location: |
Opfikon, Zurich, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 47° 25' 35.93" N 8° 34' 25.75" E |
Technical Information
Dimensions
width | 8.50 m | |
total length | 38.80 m | |
span lengths | 7.90 m - 23.00 m - 7.90 m | |
number of spans | 3 | |
length between springing axes | 31.00 m | |
roadway / carriageway width | 5.50 m | |
walkway width | 2 x 1.70 m |
Quantities
concrete volume | 200 m³ |
Cost
cost of construction | Swiss Franc 118 000 | |
cost of construction per m² | Swiss Franc 342 |
Materials
deck |
prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
portal legs |
reinforced concrete
|
Participants
Design
- P. Soutter (designer)
Structural engineering
- W. Schalcher (structural engineer)
- J.-D. Pochon (structural engineer)
Contractor
Prestressing
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Puente pretensado con montantes triangulados. In: Hormigón pretensado, v. 7, n. 35 (November 1956), pp. 1-9. (1956):
- About this
data sheet - Structure-ID
20074264 - Published on:
27/11/2017 - Last updated on:
28/11/2017