General Information
Beginning of works: | 2003 |
---|---|
Status: | in use |
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Qiryat Ono, Tel Aviv, Israel |
---|---|
Coordinates: | 32° 3' 49.73" N 34° 50' 14.21" E |
Technical Information
Dimensions
total length | 75 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Contractor
Prestressing
Prestressing system
Project management
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20010263 - Published on:
08/09/2003 - Last updated on:
14/11/2016