General Information
Completion: | 7 November 2011 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Steel bridge |
Location
Location: |
Olivet, Loiret (45), Centre-Val de Loire, France |
---|---|
Crosses: |
|
Is supported by: |
Maréchal Leclerc Bridge
|
Coordinates: | 47° 52' 7.92" N 1° 54' 9.08" E |
Technical Information
Dimensions
walkway width | 2.30 m | |
access ramps | total length | 70 m |
main bridge | ||
---|---|---|
total length | 250 m |
Cost
construction cost (without tax) | Euro 2 400 000 |
Materials
deck |
steel
|
---|---|
arches |
steel
|
deck flooring |
timber
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Des ponts élargis pour durer. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5647 (17 February 2012), pp. 38-41.
- La passerelle sur le Loiret à Olivet. In: Travaux, n. 888 (May 2012), pp. 53-64. (2012):
- About this
data sheet - Structure-ID
20067039 - Published on:
19/05/2015 - Last updated on:
27/04/2022