0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1921
Status: destroyed (1941)

Project Type

Structure: Truss bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge

Location

Location: ,
Crossed:
  • Sava River
Replaces: Old Sava River Railway Bridge (1914)
Replaced by: Old Sava River Railway Bridge (1941)

Technical Information

Dimensions

total length 462.00 m
span lengths 86.1 m - 3 x 96.6 m - 86.1 m
number of spans 5

Materials

truss steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20003752
  • Published on:
    20/06/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine