General Information
Project Type
Structure: |
Through truss bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Structure: |
Lattice truss bridge |
Material: |
Steel bridge |
Location
Location: |
Belgrade, Serbia |
---|---|
Crosses: |
|
Replaces: |
Old Sava River Railway Bridge (1941)
|
Coordinates: | 44° 48' 5.32" N 20° 26' 20.55" E |
Technical Information
Dimensions
total length | 377.4 m | |
span lengths | 96.7 m - 96.0 m - 96.0 m - 48.8 m - 46.9 m | |
number of spans | 5 |
Materials
truss |
steel
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Belgrade Bridges across the Danube and Sava River. Presented at: 3. Internationale Donaubrückenkonferenz, 3rd International Conference on Bridges across the Danube, 29-30/10/1998, Regensburg, Germany, pp. 358-372. (1998):
- About this
data sheet - Structure-ID
20003755 - Published on:
20/06/2002 - Last updated on:
05/02/2016