0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1927
Completion: 1928
Status: in use

Project Type

Structure: Through truss bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge

Location

Location: , ,
Crosses:
  • Main River
Replaces: Old Niederrad Railroad Bridge (1882)
Coordinates: 50° 5' 21.52" N    8° 37' 52.42" E
Show coordinates on a map

Technical Information

Dimensions

width 11 m
total length 218 m
span lengths 44.05 m - 3 x 44.50 m - 44.05 m
number of spans 5

Materials

truss steel

Chronology

1945

Dynamited by retreating German troops.

20 June 1945

Recovery of the wreckage begins.

7 January 1946

The reconstructed bridge enters service.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005254
  • Published on:
    21/09/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine