0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: January 1914
Status: to be demolished

Project Type

Material: Reinforced concrete bridge
Structure: Haunched girder bridge
Material: Structurae Plus/Pro - Subscribe Now!
Function / usage: original use:
Road bridge

Location

Location: , ,
Replaced by: Mangere Footbridge (2019)
Coordinates: 36° 56' 5.11" S    174° 47' 10.68" E
Show coordinates on a map

Technical Information

Materials

deck reinforced concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20074163
  • Published on:
    10/11/2017
  • Last updated on:
    20/11/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine