General Information
Completion: | 1951 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
main bridge: Steel bridge |
Structure: |
main bridge: Truss arch bridge main bridge: Through arch bridge approach viaducts: Deck arch bridge |
Material: |
approach viaducts: Reinforced concrete bridge |
Location
Location: |
Kyiv, Ukraine |
---|---|
Crosses: |
|
Next to: |
New Darnytskyi Bridge (2011)
|
Coordinates: | 50° 25' 2.46" N 30° 35' 25.02" E |
Technical Information
Dimensions
span lengths | 12 x 53.0 m - 3 x 109.20 m - 53.0 m | |
number of spans | 16 | |
number of tracks | 2 |
Materials
approach viaducts |
reinforced concrete
|
---|---|
truss |
steel
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridge Engineering in Ukraine. In: (2013): Handbook of International Bridge Engineering. CRC Press, Boca Raton (USA), ISBN 978-1439810293, pp. 884-885. (2013):
- About this
data sheet - Structure-ID
20082560 - Published on:
19/03/2022 - Last updated on:
03/03/2023