General Information
Name in local language: | Talbrücke Öhringhausen |
---|---|
Beginning of works: | 2018 |
Completion: | 3 June 2020 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Support conditions: |
for registered users |
Material: |
Prestressed concrete bridge |
Structure: |
Single-cell box girder bridge |
Construction method: |
In-situ casting on falsework |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Drolshagen, Olpe (Kreis), North Rhine-Westphalia, Germany |
---|---|
Address: | B 55 |
Coordinates: | 51° 1' 45.58" N 7° 49' 17.10" E |
Technical Information
Dimensions
width | 14.85 m | |
total length | 132.00 m | |
span lengths | 28.30 m - 2 x 37.70 m - 27.30 m | |
number of spans | 4 | |
bridge surface | 1 960 m² | |
deck | deck depth | 2.85 m |
Quantities
concrete volume | 3 250 m² | |
prestressing steel | 25 t | |
reinforcing steel | 570 t |
Design Loads
special live load | 299 t | |
design code(s) | DIN EN 1991-2 |
Cost
cost of construction | Euro 6 800 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. Presented at: 31. Dresdner Brückenbausymposium, 7./8. Juni 2022, Dresden (Germany), pp. 211. (2022):
- About this
data sheet - Structure-ID
20083088 - Published on:
08/06/2022 - Last updated on:
08/06/2022