General Information
Completion: | 2011 |
---|---|
Status: | in use |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
Twin girder bridge |
Construction method: |
Longitudinal launching |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Devecey, Doubs (25), Bourgogne-Franche-Comté, France Voray-sur-l'Ognon, Haute-Saône (70), Bourgogne-Franche-Comté, France |
---|---|
Part of: |
|
Coordinates: | 47° 20' 15.19" N 6° 0' 21.82" E |
Technical Information
Dimensions
length | 89 m | |
span lengths | 26.5 m - 36 m - 26.5 m | |
number of spans | 3 | |
deck | on-center distance between girders | 6.30 m |
girder depth | 2.70 m | |
deck slab | width | 13 m |
thickness | 250 - 406 mm | |
piers | height | 12.77 - 13.69 m |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
main girders |
steel
|
Participants
Owner
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20028474 - Published on:
12/06/2007 - Last updated on:
04/02/2019