0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1995
Completion: 1996
Status: in use

Project Type

Location

Location: , ,
Coordinates: 46° 4' 48.24" N    8° 58' 7.72" E
Show coordinates on a map

Technical Information

Cost

cost of construction Swiss Franc 1 278 000.00

Materials

deck composite
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20066958
  • Published on:
    21/03/2015
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine