General Information
Project Type
Structure: |
T-section girder bridge |
---|---|
Function / usage: |
Road bridge Railroad (railway) bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Neheim, Arnsberg, Hochsauerlandkreis, North Rhine-Westphalia, Germany Hüsten, Arnsberg, Hochsauerlandkreis, North Rhine-Westphalia, Germany |
---|---|
Address: | Bahnhofstraße (L 544) |
Crossed: |
|
Next to: |
Oberausel Bridge (1975)
|
Replaces: |
Oberausel Bridge (1875)
|
Coordinates: | 51° 26' 22.29" N 7° 58' 11.24" E |
Technical Information
Dimensions
span lengths | 3 x 25.75 m | |
number of spans | 3 | |
deck | deck slab thickness | 0.38 m |
girder depth | 1.82 m | |
roadway / carriageway width | 7.00 m | |
walkway width | 2 x 2.10 m |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20021204 - Published on:
04/05/2006 - Last updated on:
05/02/2016