General Information
Completion: | 1982 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Stadium / Arena |
---|---|
Structure: |
roof: Arch-supported membrane structure |
Location
Technical Information
Dimensions
seats | 74 767 | |
Renovation | ||
---|---|---|
roof | arch span | 300 m |
Notes
The roof hangs in a giant arc of 80 m high. Each arc consists of two 3,5 m diameter tubes with a span of 304 m and support the new state-of-the-art roof. Movement of arc and roof construction weighing 8500 ton is done simultaneously using Enerpac PLC-controlled hydraulic systems with four 150 ton pull cylinders with 2 m stroke. These double-acting cylinders are attached to shoes in a sliding and guiding system pulling the arc with roof assembly step-by-step into the final position.
Participants
Contractor
Renovation (-2004)
Design
-
Santiago Calatrava SA
- Santiago Calatrava (designer)
Structural engineering
Contractor
Steel construction
Subcontractor
Cables
Relevant Web Sites
Relevant Publications
- 18 500 tonnes d'acier installées en dix mois. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5248 (25 June 2004), pp. 24.
- Citius, altius, fortius. Athen vor Olympia. In: Baumeister, v. 101 (August 2004), pp. 14-15. (2004):
- Cubierta del estadio Olímpico de Atenas. Presented at: IV Congreso de la Asociación Científico-Tecnica del Hormigón Estructural - Congreso Internacional de Estructuras, Valencia, 24-27.11.2008. (2008):
- Projektmanagement für das Olympiastadion Athen 2004. Das Dach und seine Errichtung. Presented at: 1. Symposium Stadien, 21.+22.10.2003, Leipzig, pp. 44-48. (2003):
- Le stade olympique prend forme. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5239 (23 April 2004), pp. 6.