0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1947
Completion: 1948
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge
Construction method: In-situ casting on falsework

Location

Location: , , , ,
Address: Cut End Road
Coordinates: 52° 57' 14.06" N    0° 2' 1.14" E
Show coordinates on a map

Technical Information

Dimensions

deck depth 1.4 m
span 21.9 m
total width 6.1 m
roadway / carriageway width 5.2 m
girders width 0.380 m
height 1.1 m
number 5

Materials

deck prestressed concrete
abutments reinforced concrete

Notes

This is the first cast in-situ prestressed concrete bridge built in England.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20074253
  • Published on:
    22/11/2017
  • Last updated on:
    26/11/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine