General Information
Completion: | 1981 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nowra, New South Wales, Australia |
---|---|
Coordinates: | 34° 51' 50.30" S 150° 36' 4.18" E |
Technical Information
Materials
piers |
reinforced concrete
|
---|
Excerpt from Wikipedia
The Nowra Bridge is a road bridge that carries the Princes Highway over the Shoalhaven River, at Nowra, New South Wales, Australia. The bridge joins the main area of Nowra to North Nowra and Bomaderry.
Description
Despite popular mythology, the bridge was not originally intended to carry a double railway track, as part of the proposed extension of the Illawarra railway line to Jervis Bay and possibly Eden.
The bridge was designed by American engineer Charles Shaler Smith and is considered to be of local historical significance. The bridge was completed in 1881 and is built from wrought iron with a steel approach span. The bridge had a timber deck for 100 years until in 1981 reinforced concrete was laid over steel Armco decking. The pairs of cast iron piers are original and were supplied locally by the Atlas Foundry, Sydney. It was the largest bridge project in New South Wales prior to the 1889 Hawkesbury River Railway Bridge. Its full length is 342 metres (1,122 ft).
Second bridge
In December 1981, a three lane concrete bridge opened to the west of the original bridge. It carried northbound traffic with the original bridge reconfigured to carry southbound traffic.
Third bridge
In August 2019 Infrastructure Australia approved the construction of a new four-lane bridge immediately to the west of the existing bridges. The new bridge will become the new crossing for northbound traffic. The existing northbound bridge will be converted for southbound traffic, allowing the bridge built in 1881 to be re-purposed as a pedestrian and cycle bridge. Funding to be shared between the Federal and New South Wales governments. Fulton Hogan commenced work in early 2020 and is expected to be completed in 2024. In February 2023 the new bridge opened, initially carrying traffic in both directions while the 1981 built bridge is refurbished.
Text imported from Wikipedia article "Nowra Bridge" and modified on September 5, 2024 according to the CC-BY-SA 4.0 International license.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
20089260 - Published on:
03/09/2024 - Last updated on:
03/09/2024