General Information
Completion: | 2002 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Cable-stayed bridge with semi-fan system |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Milwaukee, Milwaukee County, Wisconsin, USA |
---|---|
Address: | North 6th Street |
Coordinates: | 43° 2' 2.78" N 87° 55' 7.21" W |
Technical Information
Dimensions
width | 17.5 m | |
span lengths | 2 x (38 m - 60 m) | |
number of spans | 3 | |
pylon | pylon height | 39.6 m |
Cost
cost of construction | United States dollar 50 000 000 |
Materials
pylons |
concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridges built for the future - Sixth Street Bridges, Milwaukee, USA. DYNA Grip Stay Cables for the Sixth Street Bridges. Milwaukee, Wisconsin, USA. In: DSI Info, n. 11 ( 2002- 2003), pp. 46.
- Brückenbau für die Zukunft - Sixth Street Brücken, Milwaukee, USA. Einsatz von DYNA Grip Schrägseilsystemen für die Sixth Street Brücken, Milwaukee, Wisconsin, USA. In: DSI Info, n. 11 ( 2002- 2003), pp. 46.
- Construire pour l'avenir – les ponts de la Sixth Street à Milwaukee. Système de haubans DYNA Grip pour les ponts de la Sixth Street, Milwaukee, Wisconsin, USA. In: DSI Info, n. 11 ( 2002- 2003), pp. 46.
- About this
data sheet - Structure-ID
20006281 - Published on:
16/10/2002 - Last updated on:
21/04/2016