General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bochum, North Rhine-Westphalia, Germany |
---|---|
Coordinates: | 51° 28' 48.52" N 7° 11' 52.52" E |
Technical Information
Dimensions
total length | 100 m |
Materials
superstructure |
steel
|
---|---|
piers |
steel
|
Participants
Owner
Client
Architecture
-
Hegger Hegger Schleif HHS Planer + Architekten AG
- Manfred Hegger (architect)
- Günter Schleiff (architect)
- Guido Höfert (architect)
Structural engineering
-
B+G Ingenieure Bollinger und Grohmann GmbH
- Klaus Bollinger (structural engineer)
- Martin Trautz (structural engineer)
Relevant Web Sites
Relevant Publications
- Bridge Architecture + Design. 1st edition, Braun Publishing AG, Salenstein (Switzerland), ISBN 978-3-03768-025-4, pp. 92-95. (2010):
- leicht und weit. Brücken im Neuen Emschertal. Ludwig Galerie Schloss Oberhausen, Oberhausen (Germany), pp. 53-55, 137. (2005):
- Nordpolbrücke Bochum. In: Stahlbau, v. 70, n. 4 (April 2001), pp. 258-261. (2001):
- About this
data sheet - Structure-ID
20001335 - Published on:
20/02/2001 - Last updated on:
05/02/2016