General Information
Official designation: | 5617/01 Ü |
---|---|
Beginning of works: | 1998 |
Completion: | 1998 |
Duration of works: | 10 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Rigid frame bridge with inclined legs |
Material: |
Prestressed concrete bridge |
Construction method: |
In-situ casting on falsework |
Location
Location: |
Nordhausen, Nordhausen (Kreis), Thuringia, Germany |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 51° 27' 57.98" N 10° 47' 26.34" E |
Technical Information
Dimensions
length | 58 m | |
span lengths | 15.75 m - 27.50 m - 14.75 m | |
clearance | 8.20 m | |
number of spans | 3 | |
bridge surface | 348 m² | |
deck | deck depth | 0.95 - 1.42 m |
deck width | 6.00 m |
Quantities
concrete volume | 516 m³ | |
prestressing steel | 5.5 t | |
reinforcing steel | 55 t |
Cost
cost of construction | German Mark 880 000 | |
cost of construction per m² | German Mark 2 532.00 |
Materials
deck |
prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
portal legs |
reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Architectural consulting
- Hans-Günther Burkhardt (architectural consultant)
Checking engineering
- Langrock (checking engineer)
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 128-132.
- About this
data sheet - Structure-ID
20020179 - Published on:
21/03/2006 - Last updated on:
05/02/2016