General Information
Completion: | 2019 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
main bridge: Haunched girder bridge main bridge: Box girder bridge |
Construction method: |
main bridge: Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
approach viaducts: Multiple T-section girder bridge |
Construction method: |
approach viaducts: Precast girders with cast-in-situ slab |
Location
Location: |
Ogooué-Maritime, Gabon |
---|---|
Coordinates: | 1° 21' 56.16" S 9° 3' 46.38" E |
Technical Information
Dimensions
total length | 4 577 m | |
height above valley floor or water | 7 - 25 m | |
number of lanes | 2 x 1 | |
piles | diameter | 1.600 m 1.800 m |
length | 50 - 85 m | |
main bridge | ||
---|---|---|
span lengths | 65 m - 120 m - 65 m | |
deck | deck width | 12 m |
roadway / carriageway width | 9 m | |
walkway length | 2 x 1.5 m | |
northern approach viaduct | ||
span lengths | 130 x 30 m | |
number of spans | 130 | |
deck | deck width | 12 m |
roadway / carriageway width | 9 m | |
walkway length | 2 x 1.5 m | |
southern approach viaduct | ||
span lengths | 13 x 30 m | |
number of spans | 13 | |
deck | deck width | 12 m |
roadway / carriageway width | 9 m | |
walkway length | 2 x 1.5 m |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
piles |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Checking engineering
Contractor
Construction management
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20076823 - Published on:
18/02/2019 - Last updated on:
21/03/2019