0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Nickern Noise Reduction Tunnel

General Information

Beginning of works: 2003
Completion: 25 October 2004
Status: in use

Project Type

Function / usage: Noise reduction tunnel
Structure: Tunnel

Location

Location: , ,
Address: Tschirnhausstraße
For:
  • Autobahn A17
Coordinates: 50° 59' 45.01" N    13° 47' 22.33" E
Coordinates: 50° 59' 40.58" N    13° 46' 56.57" E
Show coordinates on a map

Technical Information

Dimensions

length 800 m

Cost

cost of construction Euro 8 800 000

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20014911
  • Published on:
    30/12/2004
  • Last updated on:
    20/03/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine